Upstairs (this includes the entire upstairs but our bedrooms)
Add insulation (ASAP because it is starting to get cold out)
Relocate upstairs half bath into old “extra space” room.
Map out plumbing for upstairs (sink, toilet, and standup shower)
Map out electrical for upstairs (heaters and outlets)
Drywall exterior walls once plumbing and electrical is at least dry run.
Frame out and sheetrock the bathroom.
Frame and sheetrock out a floating wall for upstairs office.
Redo all ceilings upstairs (they are way unlevel now and no more rooms keeping this hidden).
Redo railing (temporary up now – build wall)

Kitchen – A Complete Overhaul

Rip out old sheetrock on walls and ceiling.
Along back kitchen wall we need to run plumbing for upstairs bathroom.
Rip out old kitchen cabinets and countertops.
Remove huge old hutch and try to keep it in one piece.
Rip out old flooring.
Block off entrance to basement from kitchen (we have another and this is where the mice are coming up).
Pull out old oven fan.
Hang new drywall on walls and ceilings.
After hanging it, tape it, prime it, and then paint walls and ceiling.
Move up the middle of the ceiling about a ft for unique lighting effect.
Install new flooring (nicer, cleaner, and not as cheap looking tiles).
Buy new kitchen cabinets and countertops.
Install them so that we gain more space in kitchen.
Trim out window, wall bottoms, and all doorways.
Install new electric baseboard heater.
Buy and install lights and new fan.
Remove old fridge that goes into garage (our fridge doesn’t fit inside).
Buy and install new sink and maybe a dishwasher.
Do tile backsplash around countertop